The weather was good but we were still on Winter Hours so it was dark early in the day, which meant not a lot of work could be done after work.
We had purchased a water maker, fridge, freezer, electronics and decided we needed to re-install the black tank (pooh tank for those who don't know). A lot of this Steve had to do in the engine room, which you will see in the video is a small small room that Steve thinks even a child would have difficulty getting into and working! Whilst knowing that we needed all these things to be as self-sufficient as possible, it was proving more difficult to install than we thought.
We were both still working so it was like having 2 full-time jobs each. All the time knowing that we had to decide on a launch date and would like that to be before Steve finishes his job, then he would be able to control the launch himself. Alas, we didn't launch in March.